Onride video integration

 

In close collaboration with the operator and ride manufacturers Dynacam offers onride camera installation (supervision), commissioning and testing for each onride video system.
 

The integration is done in 4 chronological steps:

  • Before delivery, the customer can perform a Factory Acceptance Test (FAT) on a test-setup of the system at the production facility of Dynacam or the ride manufacturer, to be sure that the system works fine and is compliant with the system specification.
  • After delivery, the onsite installation will take plcae. Since the onride cameras work fully autonomously and have no complicated mechanical/electrical connections with the vehicle, installation can be performed fast and easily.
  • After installation of the onride video system into the vehicle, the video system will be put into operation. The commissioning will be completed with the Site Acceptance Test (SAT). Testing and commissioning is done with the latest safety regulations in mind.
  • After the SAT, the customer will receive necessary training and instruction and the relevant documentation such as maintenance instructions and manuals to work with the camera system, diagnose possible errors and perform easy service & calibration tasks.